<head>Panopticon</head> <p>Smiths Work calculated as follows. — £ s d</p> <p><sic>Cwt</sic><lb/>12..0 of Wrought Iron in Gratings to Cell Windows }56<hi rend="superscript">s</hi>/<lb/>NB 3 Stories above level of Ground — — — —} 33.12..0</p> <p><sic>Cwt.</sic><lb/>70.. 0 Wrought Iron in Gratings & doors to front }56<hi rend="superscript">s</hi>/<lb/>of Cells — — — — —} <!-- underline and sub total in pencil --><hi rend="underline">196..0..0</hi><lb/>229 12 0</p> <p><sic>ft in</sic><lb/>500..0 <sic>Sup.<hi rend="superscript">l</hi></sic> of Cell Galleries <sic>includ<hi rend="superscript">g</hi></sic> floor & <sic>Ballusters</sic>3<hi rend="superscript">s</hi>/- 76..0..0<lb/>75..0 <sic>tun</sic> of Cast Iron Hollow <sic>Collumns</sic> — — 6<hi rend="superscript">s</hi>/- 22..10..0<lb/>11..0 <sic>tun</sic> of Cast iron Grating to Grated Passage 15<hi rend="superscript">s</hi>/- 8..5..0<lb/>60.. <sic>tun</sic> of Hollow Pipe for Warming Cells &c— — 4<hi rend="superscript">s</hi>/- 12..0..0<lb/><sic>N<hi rend="superscript">o</hi></sic> 6 Strong Locks to cells — — — — 10<hi rend="superscript">s</hi>/6<hi rend="superscript">d</hi> <hi rend="underline">3..3..0</hi><lb/>£351..10..0<lb/>Multiplied by —— <hi rend="underline">24</hi><lb/>8436..0..0</p> <p><sic>No.</sic> 2 Staircases to lead to the Cell Galleries} <lb/>containing <sic>ab<hi rend="superscript">t</hi></sic> 1200 <sic>ft. Supl<hi rend="superscript"></hi></sic> of Cast iron Work} 400..0..0<lb/><sic>compleat</sic> — — — — — —<sic>ea</sic> <hi rend="superscript">£</hi> 200}</p> <p><sic>N<hi rend="superscript">o</hi>.</sic> 2 ditto from Inspection <add>Galleries</add> to Cell Galleries <hi rend="superscript">£</hi> 160 320..0..0</p> <p><sic>N<hi rend="superscript">o</hi></sic> 8 Large Cast Hollow Pillars round the Chapel<lb/>being <sic>ab<hi rend="superscript">t</hi></sic> 75 foot long ——— <sic>ea</sic> £40 320..0..0</p> <p><sic>N<hi rend="superscript">o</hi> 12 Water Pipes from Annular Cistern<lb/>and 144 Branches from <sic>d<hi rend="superscript">o</hi></sic> & Cocks to <sic>d<hi rend="superscript">o</hi></sic> <hi rend="superscript">£</hi>20 240..0..0</p> <p>Cast iron Inspectors Bridge from <sic> Gall<hi rend="superscript">y.</hi></sic> to Exit 15..0..0</p> <p><sic>N<hi rend="superscript">o</hi></sic> 7 Stoves with retorts <sic>compleat</sic> & drains<lb/>for External Fresh Air ——— <sic>ea</sic> £20 140..0..0</p> <p><sic>N<hi rend="superscript">o</hi>. 72 Water Closets for Cells <sic>compleat</sic> with<lb/><sic>Bason</sic> &c — ———— <hi rend="underline">720..0..0</hi><lb/>10591..0..0</p> <p>Extras in various <sic>unforeseen</sic> Business 50..0..0<lb/>Total ... £10641..0..0</p> <!-- calculation in pencil underneath --> <p> <hi rend="underline">1926..4..0</hi><lb/>£8714..16..0</p> <!-- pencil calculations in header --> <p>229.12.0<lb/><hi rend="underline">24</hi> 24<lb/>716 £14-4<lb/><hi rend="underline">258</hi><lb/>3296<lb/><hi rend="underline">14</hi><lb/>3300</p> <p>£1148<lb/<hi rend="underline">>226 12</hi><lb/>1374</p> <p>12<lb/><hi rend="underline">14</hi><lb/>48<lb/><hi rend="underline">12</hi><lb/>168</p> <p>70<lb/><hi rend="underline">14</hi><lb/>980<lb/><hi rend="underline">168</hi><lb/>1148<lb/><hi rend="underline">4</hi><lb/>4532<lb/>226</p> <p>56<lb/><hi rend="underline">14</hi></p> <!-- calculation in pencil in left hand margin --> <p>3300<lb/><hi rend="underline">1374</hi><lb/>1926</p> | |||
<!-- DO NOT EDIT BELOW THIS LINE --> | <!-- DO NOT EDIT BELOW THIS LINE --> | ||
{{Metadata:{{PAGENAME}}}}{{ | {{Metadata:{{PAGENAME}}}}{{In_Progress}} |
Panopticon
Smiths Work calculated as follows. — £ s d
Cwt
12..0 of Wrought Iron in Gratings to Cell Windows }56s/
NB 3 Stories above level of Ground — — — —} 33.12..0
Cwt.
70.. 0 Wrought Iron in Gratings & doors to front }56s/
of Cells — — — — —} 196..0..0
229 12 0
ft in
500..0 Sup.l of Cell Galleries includg floor & Ballusters3s/- 76..0..0
75..0 tun of Cast Iron Hollow Collumns — — 6s/- 22..10..0
11..0 tun of Cast iron Grating to Grated Passage 15s/- 8..5..0
60.. tun of Hollow Pipe for Warming Cells &c— — 4s/- 12..0..0
No 6 Strong Locks to cells — — — — 10s/6d 3..3..0
£351..10..0
Multiplied by —— 24
8436..0..0
No. 2 Staircases to lead to the Cell Galleries}
containing abt 1200 ft. Supl of Cast iron Work} 400..0..0
compleat — — — — — —ea £ 200}
No. 2 ditto from Inspection Galleries to Cell Galleries £ 160 320..0..0
No 8 Large Cast Hollow Pillars round the Chapel
being abt 75 foot long ——— ea £40 320..0..0
No 12 Water Pipes from Annular Cistern
and 144 Branches from <sic>do & Cocks to do £20 240..0..0
Cast iron Inspectors Bridge from Gally. to Exit 15..0..0
No 7 Stoves with retorts compleat & drains
for External Fresh Air ——— ea £20 140..0..0
No. 72 Water Closets for Cells <sic>compleat with
Bason &c — ———— 720..0..0
10591..0..0
Extras in various unforeseen Business 50..0..0
Total ... £10641..0..0
1926..4..0
£8714..16..0
229.12.0
24 24
716 £14-4
258
3296
14
3300
£1148<lb/>226 12
1374
12
14
48
12
168
70
14
980
168
1148
4
4532
226
56
14
3300
1374
1926
Identifier: | JB/157/069/001"JB/" can not be assigned to a declared number type with value 157. |
|||
---|---|---|---|
1792 |
|||
157 |
panopticon |
||
069 |
panopticon |
||
001 |
|||
calculations |
2 |
||
recto |
|||
thomas hardwick |
[[watermarks::gr [crown motif]]] |
||
53439 |
|||